This week, Francisco, Patrick, and I continue on just thinking of concepts for the re-scoped portion of our project. Dr. Furman was impressed with the couple of ideas that we had come up with for last week, and so we are looking for more creative ideas as well as finding other needed values for this project, like wind loading, solar panel frame profile, and other things. Reflecting on this week, I am glad we're getting back on track and I hope we can finish strong. 3/11-3/15

Weekly update

This week Francisco, Patrick and I had a meeting with Dr. Furman about a re-scoping of the current project. This re-scoping just focuses on the mounting mechanism for the project, so the team has been tasked to come up with several ideas on how to combat this problem. Pulling back down the project to this point was not the idea situation that I would have liked to have happened, but now that we're at this point, the best thing to do is move forward and put together some great ideas for this project nevertheless. 3/4-3/8

Weekly Update

This week, Patrick and I brainstormed the final things that we need to have in line in order to have success with the presentation. The ideas that we then decided on would be assigned via our team chat on slack. We also discussed with Ralion about some things that he could help us do to help us out in our preparation. With the presentation coming up quickly, we'll have a lot on our plate, but we are prepared for the challenges ahead. 2/25-3/1

Weekly Update

This week, Francisco and I met with Dr. Furman and Mr. Swenson to brush up our design requirements so that we have some great news to share during the first round of presentations for this semester. Some things that we touched upon were the aesthetics of the project, which the team has been looking for ways to quantify this result, mainly because the idea of something "looking good" has a different definition to everyone. We decided to create a public pole that gathers public consensus on the frame, and see if we can use this data to help our project in any way. Reflecting on this week, I feel like the team has a good idea of where we need to go next, and with some specific ideas now implanted in our game plan, we will prepare for the coming two weeks. 2/18-2/22

Weekly Update

This week, Francisco, Patrick, and I met with Ralion, a San Jose State mechanical engineering student who works at a Solar PV frame manufacturer, to come up with ideas furthering our current design, as well as receiving valuable advice from someone with industry experience. He will continue to give us great ideas while the team itself is trying to prepare the finished product of the solar panel frame. Reflecting on this week, I feel fairly confident that the direction of the team will be great in the coming weeks. Even at our stumbling trying to figure out how we should move as we change scenery. 2/11-2/15

Weekly Update

This beginning week of the semester, Francisco, Patrick, and I worked together to get the team on track after the big move from the old warehouse to the new facility. We also are spending some time brainstorming where we can improve our old ideas from last semester as to not sound stale while we are coming up to finalizing our ideas. Reflecting on this week, we will have to work very hard to keep on track for the coming weeks as production and manufacturing our Solar PV frame is not too far away. 2/4-2/8

Weekly Update

This week Francisco, Patrick, and I took it relatively easy, as classes are transitioning into finals. After Finals comes and goes, we will dedicated our valuable time to creating a solid final report for ME 195a and pack up this project for the semester. We have been in talks to continue working over the break to continue brainstorming ideas / questions needed to be addressed as well as making up for loss time when we had difficulties earlier this semester. With luck, the next semester is looking bright for us. 12/3-12/7